PC Gold ($PC2)’s Spring Hill pre-feasibility study makes a material royalty assumption that deserves to travel with its headline valuation. The model assumes the RIVI net smelter return royalty falls from 5% to 3% through a buyback. The option has not been exercised, and its A$24.75m cost is excluded from both the PFS capital estimate and financial evaluation. Original 24 November filing, page 24.

The company discloses this clearly in the detailed study. It is a modelling dependency to resolve, rather than a reason to invent a corrected NPV or allege that an undisclosed payment has been concealed.

Spring Hill also has a substantial new Probable Ore Reserve and a positive reserve-only case. A fair reading needs both the economic support and the exclusions.

The saving and the payment belong together

The existing deed allows a two-percentage-point RIVI royalty buyback for an A$750,000 option fee plus A$24m exercise payment. The PFS uses the resulting 3% RIVI rate within a combined royalty allowance of approximately 6.7% of revenue. At the full 5% RIVI rate, the study says the combined burden would be approximately 8.7%. Other royalty components retain their own bases and terms. Page 24.

Buying out a royalty can be economically attractive: an upfront payment may reduce charges over many years of production. Its value depends on timing, production, price and the actual contractual terms. The issue here is narrower. The model includes the lower recurring charge while expressly excluding the cost of obtaining it.

Subtracting A$24.75m mechanically from the headline NPV would not produce a verified alternative valuation. The timing and tax treatment of the payment would need to be modelled properly. Leaving the payment out of the funding discussion would be equally unhelpful.

There is more than one valuation convention

The production-target case reports A$1.591bn pre-tax NPV at 5%, and A$1.239bn post-tax NPV at 3.5%, using A$5,500/oz gold. The discount rates differ, so the gap between those two figures cannot be described simply as tax. Values are expressed in real November 2026 dollars with a valuation date of 30 September 2027; financing costs are excluded. Pages 2–4 and financial evaluation.

The initial Probable Ore Reserve is 35.45Mt at 0.83g/t for 951,000oz, effective 20 November 2026. Reserve ounces sit within the broader resource rather than adding to it. The larger production target includes 12% Inferred material by contained gold ounces; that lower-confidence component is not itself an Ore Reserve. Pages 2–5.

An important counterargument survives a more conservative comparison. The reserve-only case, at A$4,500/oz, reports approximately A$739m pre-tax NPV at 5%. That is a different mine case as well as a different price assumption; comparing it with A$1.591bn does not isolate price sensitivity. It does show that the study’s positive result does not depend entirely on including the Inferred component. These remain model outputs, not a current equity valuation. Financial evaluation.

Construction capital is another defined boundary

Estimated pre-production capital is approximately A$413m, including about A$30m contingency. It excludes working capital, financing costs and specified expenditure before the investment decision, including A$13.3m for the camp and laboratory. The royalty buyback is a further expressly excluded item. Pages 23–24.

September cash of A$85.5m is a historical balance. The company says it funds work towards the feasibility study and investment decision; it does not establish that construction is financed. No construction-financing arrangements are in place at the announcement date. A subtraction of September cash from the construction estimate would ignore intervening expenditure and the other funding boundaries. Funding disclosure.

Existing approvals cover earlier activities, while the expanded mine, proposed processing plant and tailings facilities need further assessment and approvals. The study identifies environmental work, including ghost-bat habitat considerations, within that path. The DFS and investment decision are targeted for Q3 2027, and first gold for Q1 2029, subject to the remaining work. Pages 22–25.

In our view, the reserve case warrants serious follow-up. The useful next milestone is an integrated study and funding plan that includes the price of the royalty reduction it assumes, along with the approvals and expenditure needed to reach production.