Rimfire Pacific Mining ($RIM)’s latest Murga testwork contains an encouraging direction of travel and an important limit. After 21 weeks, bottle rolls had extracted 37.1% of the scandium from a saprolite sample and 18.4% from a laterite sample. The often more eye-catching 73% and 34% at 52 weeks are projections, conditional on the fitted extraction rate continuing. Original 26 November release, pages 2–3.
That distinction is the starting point for a fair reading. The tests are producing information. A year-long recovery result has not yet been measured.
What has actually been tested
The two samples came from one diamond hole, FI2679: 0.74kg of saprolite grading 215ppm scandium, and 1kg of laterite grading 222ppm scandium. Leaching used atmospheric pressure and ambient temperature. These are laboratory samples, rather than a demonstrated average response across the deposit.
Rimfire derived its 52-week estimates with a linear best-fit line through the weekly data, excluding the initial rapid extraction. It explains why longer leach periods could be relevant by reference to analogous laterite processing. That is a technical rationale for testing the hypothesis. It does not establish that this ore will maintain the fitted rate for another 31 weeks. Pages 2–3.
Nor does dissolved scandium establish recovery into a saleable final product. Subsequent separation, purification and product specifications would have to be addressed before assigning a commercial recovery or payable value.
At 21 weeks, reported sulphuric-acid consumption was 0.46 tonnes per tonne of saprolite and 0.28 tonnes per tonne of laterite. The issuer describes consumption as low. Those laboratory quantities still need a process design, reagent-cost assumptions and operating evidence before they become a mine-cost claim. The saprolite solution’s reported scandium-to-iron ratio is potentially useful for downstream separation, but it is not a finished-product purity measurement. Page 3.
The next tests ask a different question
Two 40kg saprolite columns have been loaded after preparation and agglomeration. Electric Metals plans to compare acid concentrations and percolation rates over approximately 30 days. The point is partly physical: liquid must move through the material without slumping or losing permeability. A bottle can demonstrate dissolution while leaving that question unanswered.
Electric Metals is performing those columns at no expense to Rimfire because of a gap in its work schedule. That saves a testwork bill. It does not establish low capital costs for a commercial plant.
A parallel route uses one-kilogram agitated tests at 90–95°C over 12–24 hours. Those tests seek extraction limits and acid-consumption data under heated conditions. Their results will need their own operating assumptions; they cannot be presented as achievements of the ambient-temperature bottle rolls. Pages 3–4.
Rimfire intends to stop the bottle rolls at approximately 26 weeks, with residue and solution analyses to confirm the final results. Column and tank work is expected to finish by December, followed by final results during the March 2027 quarter. A desktop financial study is planned only after the combined data arrive. No project economics are established by this update.
The constructive case is therefore practical: Rimfire is moving beyond a small rolling bottle towards tests that can expose a more relevant process constraint. The low-iron material may offer a useful processing advantage. The counterweight is that sample coverage, sustained extraction, acid demand and final-product recovery remain open questions.
Separately, the proposed 2,500m Rabbit Trap air-core programme, expected to start in January subject to approval, is exploration at another location. It is not an increase in Murga’s tested recovery or a newly declared Rabbit Trap resource. Page 4.
The Take
Opinion: Watch the column results before upgrading the economic story. A flow sheet needs material that leaches, liquid that keeps moving and a product customers can buy. The measured 21-week figures provide a useful baseline. Keeping the projected 52-week figures visibly separate makes the eventual comparison more informative.